GUIDE TO THE APPLICATION OF THE REGULATION RESPECTING THE SUSTAINABLE DEVELOPMENT OF FORESTS IN THE DOMAIN OF THE STATE

 

Complete guide

Schedule 5

Periods during which the work between the banks will be carried out (excavation, installation of a conduit, backfilling, slope stabilization and work concerning, bridge piers)

Table 1 Schedule 5 Periods during which the work between the banks will be carried out (excavation, installation of a conduit, backfilling, slope stabilization and work concerning, bridge piers)