


{"id":95458,"date":"2018-05-28T11:21:46","date_gmt":"2018-05-28T15:21:46","guid":{"rendered":"https:\/\/mrnf.gouv.qc.ca\/RADF\/section-124\/"},"modified":"2026-03-04T13:17:50","modified_gmt":"2026-03-04T18:17:50","slug":"section-124","status":"publish","type":"cpt_radf","link":"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/","title":{"rendered":"Section 124"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; module_class=&#8221;bg-radf&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row module_class=&#8221;wrapper-radf&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p class=\"titre-section\">Chapter V \u2013 Roads, sandpits and forest infrastructures<br \/>Division VI &#8211; Piling areas, forest camps and facilities used to operate a sugar bush<br \/>\u00a71. Piling area<\/p>\n<h1>Section 124<\/h1>\n<p>The setting up of a piling area is prohibited on a 30-m strip located along a road corridor and in its right-of-way. <img decoding=\"async\" src=\"\/wp-content\/uploads\/drapeau-texte.png\" alt=\"\" \/><\/p>\n<div class=\"disposition\">\n<h2>1<\/h2>\n<h4>Objectives<\/h4>\n<ul>\n<li>To contribute to the quality of the experience in the forest<\/li>\n<li>To ensure the safety of forest road users<\/li>\n<\/ul>\n<h4><\/h4>\n<h4>Additional information<\/h4>\n<p>In some specific situations, notably due to the topography or low volumes, the setting up of a piling area in a 30-m strip along a road corridor may be warranted. In these situations, <a href=\"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/departures\/\"><span>a request for an exemption to the Regulation under section 40 of the Sustainable Forest Development Act <\/span><\/a><span>must be\u00a0<\/span>made with the\u00a0<a href=\"https:\/\/www.quebec.ca\/gouvernement\/ministeres-organismes\/ressources-naturelles-forets\/coordonnees-structure\/reseau-regional\" target=\"_blank\" rel=\"noopener noreferrer\" title=\"management unit in charge\">management unit in charge <img loading=\"lazy\" decoding=\"async\" src=\"\/wp-content\/uploads\/lien_externe.png\" width=\"16\" height=\"15\" alt=\"\" class=\"wp-image-17461 alignnone size-full\" \/><\/a> (in French)<span>\u00a0<\/span>to stockpile wood in the right-of-way of a road designated as a road corridor or in the 30-m strip along this corridor. However, the following conditions must be met:<\/p>\n<ul>\n<li>Work must be done over a limited period of time (from harvest to transportation)<\/li>\n<li>Work must be performed during periods of low usage<\/li>\n<li>Adequate and effective road signs must be in place and maintained throughout the duration of the work<\/li>\n<li>Agreement from the main users must be obtained<\/li>\n<li>Users must be notified of the potential danger by appropriate means (public notices, sign at the ZEC&#8217;s gatehouse, etc.)<\/li>\n<\/ul>\n<p>Any other conditions that address regional issues identified by the\u00a0<a href=\"https:\/\/www.quebec.ca\/gouvernement\/ministeres-organismes\/ressources-naturelles-forets\/coordonnees-structure\/reseau-regional\" target=\"_blank\" rel=\"noopener noreferrer\" title=\"management unit in charge\">management unit in charge <img loading=\"lazy\" decoding=\"async\" src=\"\/wp-content\/uploads\/lien_externe.png\" width=\"16\" height=\"15\" alt=\"\" class=\"wp-image-17461 alignnone size-full\" \/><\/a> (in French).<a href=\"\/wp-content\/uploads\/Art124A_anglais-web.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" title=\"Distance between a piling area and a road corridor\" src=\"\/wp-content\/uploads\/Art124A_anglais-web.jpg\" alt=\"Distance between a piling area and a road corridor\" width=\"380\" height=\"285\" \/><\/a><\/p>\n<p><span style=\"font-weight: bold;\">Figure 124A<\/span> Distance between a piling area and a road corridor<\/p>\n<\/div>\n<p>The setting up of a piling area is also prohibited within 20 m of an open peat bog, a swamp, a riparian shrub marsh, a lake or a watercourse.<img decoding=\"async\" src=\"\/wp-content\/uploads\/drapeau-texte.png\" alt=\"\" \/><\/p>\n<div class=\"disposition\">\n<h2>2<\/h2>\n<h4>Objectives<\/h4>\n<ul>\n<li>To preserve the integrity of an aquatic, wetland or riparian environment<\/li>\n<li>To avoid carrying sediment into an aquatic, wetland or riparian environment<\/li>\n<\/ul>\n<p><a href=\"\/wp-content\/uploads\/Art124B_anglais-web.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" title=\"Distance between a piling area and a wetland or aquatic environment\" src=\"\/wp-content\/uploads\/Art124B_anglais-web.jpg\" alt=\"Distance between a piling area and a wetland or aquatic environment\" width=\"380\" height=\"285\" \/><\/a><\/p>\n<p><span style=\"font-weight: bold;\">Figure 124B<\/span> Distance between a piling area and a wetland or aquatic environment<\/p>\n<\/div>\n<p>The organic matter from the scraping of soil for the laying out of a piling area must be piled more than 20 m from an open peat bog, a swamp, a riparian shrub marsh, a lake or a watercourse for its reuse. Runoff from a piling area must be diverted to a vegetation area located more than 20 m from those environments.\u00a0<img decoding=\"async\" src=\"\/wp-content\/uploads\/drapeau-texte.png\" alt=\"\" \/><\/p>\n<div class=\"disposition\">\n<h2>3<\/h2>\n<h4>Objectives<\/h4>\n<ul>\n<li>To preserve the integrity of an aquatic, wetland or riparian environment<\/li>\n<li>To avoid carrying sediment into an aquatic, wetland or riparian environment<\/li>\n<li>To preserve organic matter in order to recreate conditions conducive to regeneration<\/li>\n<\/ul>\n<p><a href=\"\/wp-content\/uploads\/Art124B_anglais-web.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" title=\"Distance between a piling area and a wetland or aquatic environment\" src=\"\/wp-content\/uploads\/Art124B_anglais-web.jpg\" alt=\"Distance between a piling area and a wetland or aquatic environment\" width=\"380\" height=\"285\" \/><\/a><\/p>\n<p><span style=\"font-weight: bold;\">Figure 124B<\/span> Distance between a piling area and a wetland or aquatic environment<\/p>\n<p><a href=\"\/wp-content\/uploads\/Art124C_anglaisweb.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" title=\"Diversion of runoff water from a piling area\" src=\"\/wp-content\/uploads\/Art124C_anglaisweb.jpg\" alt=\"D\u00e9tournement des eaux de ruissellement provenant d\u2019une aire d\u2019empilement \" width=\"380\" height=\"285\" \/><\/a><\/p>\n<p><span style=\"font-weight: bold;\">Figure 124C<\/span> Diversion of runoff water from a piling area<\/p>\n<\/div>\n<p>The distance of 20 m referred to in the second and third paragraphs is measured from the perimeter of the peat bog, swamp or marsh or from the upper limit of the shore of the lake or bank of the watercourse. In the presence of a riparian ecotone, the measurement is made from the limit of the ecotone farthest from the environment to be protected.\u00a0<img decoding=\"async\" src=\"\/wp-content\/uploads\/drapeau-texte.png\" alt=\"\" \/><\/p>\n<div class=\"disposition\">\n<h2>4<\/h2>\n<h4>Objective<\/h4>\n<ul>\n<li>To clarify the scope of the Regulation respecting the sustainable development of forests in the domain of the State<\/li>\n<\/ul>\n<p><a href=\"\/wp-content\/uploads\/Art124B_anglais-web.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" title=\"Distance between a piling area and a wetland or aquatic environment\" src=\"\/wp-content\/uploads\/Art124B_anglais-web.jpg\" alt=\"Distance between a piling area and a wetland or aquatic environment\" width=\"380\" height=\"285\" \/><\/a><\/p>\n<p><span style=\"font-weight: bold;\">Figure 124B<\/span> Distance between a piling area and a wetland or aquatic environment<\/p>\n<p><a href=\"\/wp-content\/uploads\/Art124C_anglaisweb.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" title=\"Diversion of runoff water from a piling area\" src=\"\/wp-content\/uploads\/Art124C_anglaisweb.jpg\" alt=\"Diversion of runoff water from a piling area\" width=\"380\" height=\"285\" \/><\/a><\/p>\n<p><span style=\"font-weight: bold;\">Figure 124C<\/span> Diversion of runoff water from a piling area<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"featured_media":0,"parent":95265,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_oasis_is_in_workflow":0,"_oasis_original":0,"_oasis_task_priority":""},"class_list":["post-95458","cpt_radf","type-cpt_radf","status-publish","format-standard","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Section 124 - Minist\u00e8re des Ressources naturelles et des For\u00eats<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Section 124 - Minist\u00e8re des Ressources naturelles et des For\u00eats\" \/>\n<meta property=\"og:description\" content=\"[et_pb_section fb_built=&#8221;1&#8243; module_class=&#8221;bg-radf&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row module_class=&#8221;wrapper-radf&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;] Chapter V \u2013 Roads, sandpits and forest infrastructuresDivision VI &#8211; Piling areas, forest camps and facilities used to operate a sugar bush\u00a71. Piling area Section 124 The setting up of a piling area is prohibited on a 30-m [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/\" \/>\n<meta property=\"og:site_name\" content=\"Minist\u00e8re des Ressources naturelles et des For\u00eats\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/RessourcesNaturellesForets\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-04T18:17:50+00:00\" \/>\n<meta property=\"og:image\" content=\"\/wp-content\/uploads\/Image-g%c3%a9n%c3%a9rale-hiver_FB.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@mrnfqc\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/\",\"url\":\"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/\",\"name\":\"Section 124 - Minist\u00e8re des Ressources naturelles et des For\u00eats\",\"isPartOf\":{\"@id\":\"https:\/\/mrnf.gouv.qc.ca\/#website\"},\"datePublished\":\"2018-05-28T15:21:46+00:00\",\"dateModified\":\"2026-03-04T18:17:50+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mrnf.gouv.qc.ca\/#website\",\"url\":\"https:\/\/mrnf.gouv.qc.ca\/\",\"name\":\"Minist\u00e8re des Ressources naturelles et des For\u00eats\",\"description\":\"Prototype WordPress\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mrnf.gouv.qc.ca\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Section 124 - Minist\u00e8re des Ressources naturelles et des For\u00eats","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/","og_locale":"en_US","og_type":"article","og_title":"Section 124 - Minist\u00e8re des Ressources naturelles et des For\u00eats","og_description":"[et_pb_section fb_built=&#8221;1&#8243; module_class=&#8221;bg-radf&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row module_class=&#8221;wrapper-radf&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;] Chapter V \u2013 Roads, sandpits and forest infrastructuresDivision VI &#8211; Piling areas, forest camps and facilities used to operate a sugar bush\u00a71. Piling area Section 124 The setting up of a piling area is prohibited on a 30-m [&hellip;]","og_url":"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/","og_site_name":"Minist\u00e8re des Ressources naturelles et des For\u00eats","article_publisher":"https:\/\/www.facebook.com\/RessourcesNaturellesForets\/","article_modified_time":"2026-03-04T18:17:50+00:00","og_image":[{"width":1200,"height":630,"url":"\/wp-content\/uploads\/Image-g%c3%a9n%c3%a9rale-hiver_FB.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@mrnfqc","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/","url":"https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/","name":"Section 124 - Minist\u00e8re des Ressources naturelles et des For\u00eats","isPartOf":{"@id":"https:\/\/mrnf.gouv.qc.ca\/#website"},"datePublished":"2018-05-28T15:21:46+00:00","dateModified":"2026-03-04T18:17:50+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mrnf.gouv.qc.ca\/en\/RADF\/guide\/chapter-v\/section-124\/"]}]},{"@type":"WebSite","@id":"https:\/\/mrnf.gouv.qc.ca\/#website","url":"https:\/\/mrnf.gouv.qc.ca\/","name":"Minist\u00e8re des Ressources naturelles et des For\u00eats","description":"Prototype WordPress","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mrnf.gouv.qc.ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/mrnf.gouv.qc.ca\/en\/wp-json\/wp\/v2\/RADF\/95458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mrnf.gouv.qc.ca\/en\/wp-json\/wp\/v2\/RADF"}],"about":[{"href":"https:\/\/mrnf.gouv.qc.ca\/en\/wp-json\/wp\/v2\/types\/cpt_radf"}],"version-history":[{"count":1,"href":"https:\/\/mrnf.gouv.qc.ca\/en\/wp-json\/wp\/v2\/RADF\/95458\/revisions"}],"predecessor-version":[{"id":95459,"href":"https:\/\/mrnf.gouv.qc.ca\/en\/wp-json\/wp\/v2\/RADF\/95458\/revisions\/95459"}],"up":[{"embeddable":true,"href":"https:\/\/mrnf.gouv.qc.ca\/en\/wp-json\/wp\/v2\/RADF\/95265"}],"wp:attachment":[{"href":"https:\/\/mrnf.gouv.qc.ca\/en\/wp-json\/wp\/v2\/media?parent=95458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}